Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Biogas Plant
Next

Biogas Plant

FOB Price

Get Latest Price

( Negotiable )

|

1 Set Minimum Order

Country:

China

Model No:

Mola-B-S5

FOB Price:

( Negotiable ) Get Latest Price

Place of Origin:

chongqing

Price for Minimum Order:

-

Minimum Order Quantity:

1 Set

Packaging Detail:

Cartons

Delivery Time:

Within 15 days

Supplying Ability:

300 Set per Month

Payment Type:

T/T, L/C

Product Group :

Contact Now
Free Member

Contact Person Nancy

重庆江北区华新街, Chongqing, Chongqing

Contact Now

Product Specification

  • Volume:8-60stere

Product Description

Specification
1.Biogas equipment 
2.Long service life
3.Low maintenance cost
4.Environment-friendly

The Biogas Plant of double diaphragm is made of high-strengthened, high-elastic synthetic engineering diaphragm and of perfect anti-acid and anti-corrosion ability. Its capacity of absorbing the ambient heat and storing it is *0% higher than that of other material.

The Biogas Plant is made by adopting technology of combining internal digester and external protector. In this way ,it not only minimizes the possibility of doing damage to the internal digester, prolong its lifespan, and also create an complete Oxygen-free room for anaerobic micro organisms to do fermentation, which in return increases the Biogas Output ratio.

Product  parameter


Advantage
1.Economic and durable, low price, less investment
2.Light weight, folding, small volume, convenient transportation and carrying
3.The technology of the whole equipment series can also be customized
4.Health environmental protection, no pollution
5.The equipment is very safe
6.Installation is simple and quickp;

After-sale guide
Try our EASY FIXES before calling a technician
Has the biogas stopped?
• Check the level of the top drum to see if there is biogas.
• Check your phone for a message that your biogas credit has run out.
Is the stove flame low or is the lamp dim?
• Make sure all valves are fully open.
• Check the level of the top drum to see if there is biogas.
• Make sure that fresh dung has been loaded.
• Check all hosepipe for kinks.
• Make sure the appropriate weight is on top of the digester.
 Is the biogas system overflowing from the sides?
• Check the outlet valve for blockages and clean out any dried cow dung.
Is the dung not going into the biogas system?
• Make sure the outlet is clear
• Try to load it again in 5 hours or when the top drum rises 1 foot.
 Are you having trouble paying for biogas?
• Call Takamoto Biogas ***********8. We are open Monday to Friday 9am to 5pm.
Are you still having a problem?
• If you have tried our quick fixes but are still having a problem, call Takamoto Biogas ***********8. We are open Monday to Friday 9am to 5pm.
 

Country: China
Model No: Mola-B-S5
FOB Price: ( Negotiable ) Get Latest Price
Place of Origin: chongqing
Price for Minimum Order: -
Minimum Order Quantity: 1 Set
Packaging Detail: Cartons
Delivery Time: Within 15 days
Supplying Ability: 300 Set per Month
Payment Type: T/T, L/C
Product Group : biogas plant

Send a direct inquiry to this supplier

To:

Nancy < Chongqing MOLA Energy Technology CO., Ltd >

I want to know: